rtj
Well-known member
- Joined
- Nov 5, 2011
- Messages
- 2,972
The re-do looks like you are building new!
Good luck.
Good luck.
I think the decision was made for me.....by the finished garage slab height final i calculate ceiling height is 11' 10 1/4" so 4 post lift it is....turns out I now have a super slab depth of a minimum of 8" and much more in those strengthening grade beam areas almost like like 20" thick i think the guy doing the gravel and rebar work was down 3" more then he needed to be and when they brought it up to the correct slab height i got lots more concrete. it works for me since all that concrete acts like a big heat sink and keeps the garage cool in the summer and warm in the winter.
and here I thought it was all shop, boy, do I feel embarrassed.
you remember when subliminal suggestion was all the rage? maybe do subliminal scenting so that eventually your SO craves the smell....
sorry, that's all I got.